← All Projects
Industrial — Semiconductor Manufacturing

Process Chemical System

BIM / Revit Modelling for the Semiconductor Industry

Sector Industrial
Client Withheld under confidentiality
Service Process Chemical System
Location Singapore
Status Completed
Full BIM model overview of the process wastewater treatment system

Overview

Process chemical distribution systems in semiconductor manufacturing demand exceptional precision — handling high-purity chemicals under strict safety and contamination-control standards, where even a minor design conflict can compromise product yield or safety compliance. For this project, United Service Consultants delivered a fully coordinated BIM model of a process chemical system, integrated across structural, architectural, and MEP disciplines from design through to construction handover.

Beyond modelling and coordination, our scope extended through quantity estimation and as-built documentation, giving the client a fully verified, construction-accurate record of the completed installation.

Coordinated multi-discipline model view
Clash detection detail view of process piping

Scope of Work

LOD 350 BIM Modelling

The process chemical piping system was modelled to a level of detail defining precise size, shape, location, and orientation of every component, along with its physical relationship to surrounding building systems — the standard required for construction-ready coordination.

Multi-Discipline Clash Coordination

The process model was cross-checked against structural, architectural, and MEP systems to identify and resolve spatial conflicts before construction, protecting project timelines and eliminating on-site rework.

Quantity Estimation

Detailed material takeoffs were extracted directly from the coordinated model, providing accurate quantities for piping, valves, and fittings to support procurement and cost control.

As-Built Modelling

Following construction, the model was updated to reflect actual site conditions, providing the client with a verified as-built record for long-term facility operation and maintenance.

Isometric detail view of the coordinated BIM model

Interested in a similar project?

Contact Us